It is important to monitor risk analysis during the project. It is also important to note that the "Risk" section of the Project Overview document keeps track of the risks throughout the life cycle of the project.
In the header of the overview is a color coded indicator corresponding to the status of the risks found on the [Risks] tab.
The number(s) in the matrix on the [Risks] tab will automatically open the form for the corresponding Risk, simply by clicking on it.