# | Row index. Static and cannot be modified. This column numbers the rows in the table. |
WBS | Work Breakdown Structure. It is automatically calculated by the Planner. |
Name | Items name. One of the most important columns. It displays the hierarchy of phases, tasks and deliverables in the plan. All values can be modified except for the very first row, the "project name" which is generated automatically when the plan is created and cannot be modified. |
Resources | Displays the external IDs for the resources assigned to an item. External IDs for all resources assigned to the items are listed. To edit the list, double-click in the cell to be edited and the Item Properties Window dialog box will open. Assignments for this item can be added, changed or deleted which in turn will update the list of external IDs displayed. Note: It is NOT possible to assign resources to a phase and a task cannot be converted into a phase by indenting or outdenting, if one or more assignments already exist for it. |
Duration | Item duration. The duration of tasks can be changed directly in the "Duration" column, as long as the task is not completed or cancelled. This column is also useful to change a task into a deliverable by setting its value to "0". |
Start Date | Planned Start Date. The start planned date of items can be changed directly in the "Start" column, as long as the item is NOT in progress, completed or cancelled. The date value can be changed more intuitively by using the small popup calendar available on the right-hand part of the cell. |
End Date | Planned End Date. Acting like the "Start" column, the planned end date of tasks can be changed directly in the "End" column, as long as the task is NOT completed or cancelled. The date value can also be changed by using the small popup calendar available on the right-hand part of the cell. |
Actual Start Date | The date work on the item actually began. This value cannot be modified. |
Actual End Date | The date the item was marked completed. This value cannot be modified. |
Planned Load | Total planned workload for the task. This cell is NOT directly editable as this is the computed sum of all assignments. |
Actual Load | The sum of all actual assignments to individuals in the Planned column of the [Resources] tab. |
Remaining Load | Difference between Planned-Actual. |
EAC | The EAC (Estimated at Completion) load is the sum of all individual EAC loads computed in the EAC column of the [Resources] tab. |
Delta Load | Difference between Actual-Planned. |
Predecessor | Indicates if there are any dependencies between items and displays the row number of the items it is dependent upon with remark on the type (FF,FS,SF,SS; F=Finish; S=Start) |
Priority | The Priority of the item. Can be changed within the column via Dropdown. |