Rename a Resource (v8.xx)

Rename a Resource (v8.xx)

To replace a project team member you must first make sure that the replacement resource has already been added to the project team.


The function pointed at the situation, when a planned Resource should be changed during Project Planning (stand-by).

Edit the Project description.

Click on the [Actions] menu and select "Rename a resource".



In the "Resource replacement" dialog box that opens, select the resource to be replaced and the replacement resource:

Once the replacement resource has been selected, all assignments made to the replaced resource will be re-assigned to the replacement resource.


    • Related Articles

    • Rename a Resource (v8.xx)

      This function is used to manage the situation when a resource Lotus Notes username is changed for one reason or another. Edit the concerned 'Resource' document. Click on the menu [Actions > Resource Rename]. In the dialog box, input the required ...
    • Rename a Project or Change Project Code (v8.xx)

      It is possible to rename a project at any time. This function allows you to change the project name and code at the same time. To rename a project Open the project description. Place the document into edit mode by clicking on the "Edit" button on the ...
    • Resource Rates (8.xx)

      In the [Resources] module, The "Standard rates" setup document lets you define default rates, as well as standard rates by activity type, when "Multi-rates management" has been enabled in the "General" setup document. Definition of default rates When ...
    • Replacing a Resource (v8.xx)

      To replace a project team member you must first make sure that the replacement resource has already been added to the project team. Next: Click on the "Replace resource" icon on the toolbar In the "Resource replacement" dialog box that opens, select ...
    • Replace a Resource (v8.xx)

      This function is used to manage the situation when a resource must be replaced with another in one specific databases. Edit the concerned 'Resource' document. Click on the menu [Actions > Replace the existing resource]. In the dialog box, select the ...