Replace a Resource (v10.xx)

Replace a Resource (v10.xx)


To replace a project team member, ensure that the replacement resource has already been added to the project team. The function is useful when a planned resource needs to be changed during project planning phase (stand-by).
  1. Edit the Project description.
  2. Click the [three dots] menu, select "Actions", and choose "Replace resource".





In the "Resource replacement" dialog box that appears, select the resource to be replaced and the replacement resource. Once the replacement resource has been selected, all assignments made to the original resource will be re-assigned to the new resource.


    • Related Articles

    • Replace a Resource (v8.xx)

      This function is used to manage the situation when a resource must be replaced with another in one specific databases. Edit the concerned 'Resource' document. Click on the menu [Actions > Replace the existing resource]. In the dialog box, select the ...
    • Replace a Resource (v10.xx)

      This function is used to manage situations where a resource must be replaced with another in a specific database. Edit the relevant 'Resource' document. Click on the menu [Actions > Replace the existing resource]. A dialog box will appear, allowing ...
    • Replacing a Resource (v8.xx)

      To replace a project team member you must first make sure that the replacement resource has already been added to the project team. Next: Click on the "Replace resource" icon on the toolbar In the "Resource replacement" dialog box that opens, select ...
    • Replacing a Resource (v10.xx)

      To replace a project team member, first make sure that the replacement resource has already been added to the project team. Then: Click on the "Replace resource" icon on the toolbar In the "Resource replacement" dialog box that opens, select the ...
    • Rename a Resource (v8.xx)

      To replace a project team member you must first make sure that the replacement resource has already been added to the project team. The function pointed at the situation, when a planned Resource should be changed during Project Planning (stand-by). ...