For each identified risk, a new Risk document must be created. This document defines which project the risk refers to and classifies the risk. Classification criteria are defined in the various Risk setup documents.
To create a new risk:
- Navigate to the [Projects] tab.
- From the content window click on the [Create] menu and select “New risk”

The new risk form will open.
Risk | Title of the risk. |
Project | The project that the risk applies to. |
Phase | The phase of the project the risk applies to. If it applies to the project as a whole, then select Global. |
Project leader | The main project leader (not the project leader substitute). |
Deadline | Visual indicators:
- Red: deadline passed
- Orange: warning
- Green: OK
|
|
Version | Version number of the document.
|
Modified on | Date and time of the last modifications. By clicking on the date you can access the history of the modifications. |
Last comment New discussion | Displays the last comments made on the risk. You can reply directly to the comments by clicking on "Reply," or create a new discussion by clicking on "New discussion". See "Collaborate with Project Live!" for more information. |
[General] tab
The [General] tab is used to define the likelihood that the risk will occur, and its potential consequences (impact).
Cerri Project can track two sets of values for likelihood and impact: the planned value (original) and the actual value after mitigation. Each set of values can have up to 6 levels of measurement, depending on the risk setup.
Once likelihood and impact have been set, the system automatically computes the severity of the risk by multiplying them (likelihood x impact). Cerri Project uses a matrix to provide a visual representation of the risk’s likelihood and impact combined.
Depending on the setup, this matrix can be a 3x3 matrix, a 6x6 matrix, or any combination in between. The matrix indicates whether each risk is high, moderate, or low.

The bullet shows the original position of the risk in the evaluation matrix. Once the qualification has been completed, the original likelihood and impact will be locked as reference data.
After the risk is locked, a new line appears below to track the actual "likelihood", "impact" and, "severity". The bullet will show the actual position of the risk in the risk matrix during and after mitigation.
| Risk 1st level | The risk’s first level of classification. The label for this field |
| of classification | comes from the Risk labels setup document. The list of choices is defined in the corresponding Risk setup document. |
Classifica- tion |
|
|
Risk 2nd level of classification | The risk’s second level of classification. The label for this field comes from the "Risk labels" setup document. The list of choices is defined in the corresponding Risk setup document, according to the value selected in the previous field. Mandatory. |
|
Risk 3rd level of classification | The risk’s third level of classification. The label for this field comes from the "Risk labels" setup document. The list of choices is defined in the corresponding Risk setup document, according to the value selected in the previous field. Only visible if the number of classification levels defined in the "Risk labels" setup document is at least "3", and then mandatory. |
Risk 4th level of classification | The risk’s fourth level of classification. The label for this field comes from the "Risk labels" setup document. The list of choices is defined in the corresponding Risk setup document, according to the value selected in the previous field. Only visible if the number of classification levels defined in the "Risk labels" setup document is "4", and then mandatory. |
|
Original/ Likelihood | Likelihood the risk will occur. List of choices. Possible values are 1 to 6, depending on the setup done in the "Risk labels" setup document. The corresponding labels come from the "Risk labels" setup document. The "Original" label comes from the same setup. |
|
Original/ Impact | Impact the risk will have once it occurs. List of choices. Possible values are 1 to 6, depending on the setup in the "Risk labels" setup document. The labels also come from the setup document. |
| Original/ Severity | The product Likelihood x Impact. |
|
Original/ Evaluation | By default, computed and equal to the severity. It can be edited manually by clicking the closed padlock icon next to the field label (the icon shows the current status). Clicking the open padlock icon reverts it to the computed value. |
|
| The padlock icons show the current status. |
|
| : Field is editable. |
|
| : Field is not editable. |
Risk Levels |
Padlock icons | Once all original values are set, they can be locked, and the actual values are displayed. The original values can then be unlocked and modified. |
|
| If there is no workflow defined, editing is done through the padlock icons. If a workflow is defined, the icons are hidden, and workflow actions must be used to lock/unlock values. See the Workflow definition document for further information. |
| Actual/ Likelihood | Computed likelihood, according to completed mitigation actions. The "Actual" label comes from the "Risk labels" setup document. |
| Actual/ Impact | Computed impact according to the completed mitigation actions. |
| Actual/ Severity | Computed severity: Actual likelihood x Actual impact. |
| Actual/ Evaluation | By default, computed and equal to the actual severity. However, if the original evaluation was manually modified, it remains editable and by default equal to the manually adjusted original evaluation. |
|
Matrix |
A matrix ranging from 3x3 to 6x6, depending on the setup done in the "Risk labels" setup document.
- The vertical axis represents likelihood
- The horizontal axis represents the impact.
- The small grey bullet shows the original position of the risk
- The small blue bullet shows the actual risk position sfter mitigation (once original values are locked).
|
|
| The matrix is divided into one to three zones: Green, Orange and, Red, depending on the matrix setup.
Clicking on the (?) icon next to the table title displays the matrix legend (customizable).
When the original values are locked, an icon appears in the lower left corner of the matrix to run a recalculation of the risk based on completed actions.
|
[Impact] tab
The [Impact] tab consists of text fields used to describe the impact the risk could potentially have on the project, as well as the value of the impact in days and dollars.